Scaffolding Options in Geelong

H-Frame (False Formwork):

Ideal for applications where you need to stand only 1 or 2 metres above the ground. It is not easy to make comply with Worksafe regulations above this height.
 

Water Resistant Cladding:

Well suited to recladding of leaking buildings. The scaffold is erected around the building with aluminium trusses above the roof. Corrugated iron or clear polycarbonate is clamped onto the trusses to provide a weatherproof roof. Transparent monoflex sheeting is draped around the circumference to provide further weather protection - and still permit natural light.
 

Wooden Planks:

Any length up to 4.8m long - either for sale or hire.
 

Builders Props:

(Acrow Props) Any length up to 4.4m – hire only.
 

Stair Access Towers:

Utilise a broad aluminium staircase built into Cuplok & Kwik Stage System Scaffold.
 

Formwork:

Formwork is the term given to either temporary or permanent moulds into which concrete or similar materials are poured. In the context of concrete construction, the falsework supports the shuttering moulds.

 
<< Start < Prev 1 2 Next > End >>

Page 2 of 2